Steering: | Left |
---|---|
Mgnt Certification: | BRC, HACCP, ISO/TS16949, Coc, CCC, FSC, BSCI, GMP, GSV, ISO14001, ISO13485, ISO10012 |
Gearbox: | Automatic |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Mondel Number | Description | |
Product Name | Geely Bin Yue/Coolray | |
Maximum Power (Kw) | 104kw(141PS) | |
Tire | 215/60 R17 | |
Steering Type | Electric Power | |
Parking Brake Type | Electronic Parking | |
Engine Model | JLB-4G14TB | |
Body Structure | 5-Door 5-Seat SUV | |
Maximum Speed (km/h) | 190 | |
Displacement (mL) | 1398 | |
Displacement (L) | 1.4 | |
Skylight Type | Normal Skylight | |
Steering Wheel Material | Leather | |
Keyless Start | Yes | |
Remote Boot | No |
About us!
Your questions can be answered here!
Q1, Which electric vehicle brand can you provide?
A: BYD, Red Flag, Xpeng, NIO, Chery, and Geely, as well as any other brand you desire.
Q2, What types of payment terms are acceptable?
A: Our payment terms are extremely flexible and include T/T .
Q3, What is your minimum order requirement?
A: 1 unit.
Q4, What is your distributor support policy in international markets?
A: We offer a variety of services, including modified parts, in addition to cars and accessories. And additional services including showroom design, marketing planning, agency planning, and so on.
Q5, What is your shipping method and delivery time?
A: Transport by trailer, rail and RO-RO ships. LCL Quantity permits shipment of 1 set of samples. The orders will be sent via FCL. Typically, the delivery period is 15 to 25 days after deposit receipt.